March 28 Jakarta MRT Trains to Arrive in Tanjung Priok


The trains of Jakarta Mass Rapid Transit (MRT) will be arrived longer than anticipated which was on March 26.

MRT Jakarta organization secretary Tubagus Hikmatullah expressed the first and second moving stocks are compelled to dock in Shanghai, China. “The conveyance is postponed because of terrible climate, so it will be docked at Shanghai before coming to Tanjung Priok on March 28,” he said on Wednesday, March 21.

He clarified the Ellensborg deliver conveying the trains will be in the port of Shanghai for two days and afterward withdrew to Tanjung Priok without having any travel somewhere else. The conveyance was experiencing numerous procedures.

To begin with, he proceeded with, the Toyokawa processing plant convey it to Toyohashi Port on February 21-28 which then the wagon introduced and pressed until March 3. The lifting procedure to stack into the ship took times on March 5-7. “At that point the ship is making a beeline for Tanjung Priok port for around two weeks,” he said.

Read More : Consumer Sentiment Rises to highest Level Since 2004

Each moving stock will be enrolled in prepare personality number by the directorate general of trains and put away at Lebak Bulus MRT station which has been set up ahead of time.

“The professionals’ group will introduce each prepare and be then tried along the track of Lebak Bulus-Hotel Indonesia (HI) circuitous,” Tubagus said.

MRT Jakarta prepare is made of stainless steel and its measurements of 2.950 mm x 3.655 mm. Every arrangement of trains can suit up to 1,850-1,900 travelers which comprises of six carriages